
70 September 5, 2010
2. On the DK-LM3S9B96 board (shown in Figure G-2), confirm that shunt jumpers on JP16-JP31
(B) are installed to enable the LCD touch screen. JP39 (C), the leftmost jumper indicated,
should remain uninstalled.
Figure G-2. Removing EPI Board from DK-LM3S9B96 Development Board
3. Place the EM2 expansion board on top of the DK-LM3S9B96 board while aligning the male
EPI expansion connector on the bottom side of the EM2 expansion board with the female EPI
expansion connector on the DK-LM3S9B96 development board (J2).
(A) Remove board
(B) Confirm shunt jumpers
(JP16-JP31) installed
(C) Leave JP39
uninstalled
Comentários a estes Manuais